产品搜索
产品目录
联系方式
上海侦权衡器有限公司
联系人:耿永光
手机:15216829778
电话:86-021-58378307-601
传真:86-021-58378307-606
地址:上海浦东新区拱优路79弄10号
邮编:201202
网址:www.shzqhq.com
邮箱:zqhqsh@foxmail.com
联系人:耿永光
手机:15216829778
电话:86-021-58378307-601
传真:86-021-58378307-606
地址:上海浦东新区拱优路79弄10号
邮编:201202
网址:www.shzqhq.com
邮箱:zqhqsh@foxmail.com
6.Pass out the singal
更新时间:2017-12-27 点击次数:1308次
Pass out the singal
- cable from the passing-tube.Tie up the singal cable on the iron wire in the passing-tube when passing.Then pull the iron wire to achieve the gogal of passing.Next join the singal cable to the junction box.Attention to the marking on the load cell and junction box should be consistent,then fix up the junction box onto the side-cover paltes.
- Fix up one end of the ground-cable onto the connecting-plate using M16 bolts,and fix up the other end of the ground-cable onto the ball base using M12 bolts to let the load cell short-connection.it will protects the load cell from damage by lighting when they are working.
Pass out the singal