产品分类PRODUCT

我们相信好的产品是信誉的保证!

咨询热线:

021-58378307,601

技术文章/ ARTICLE

我的位置:首页  >  技术文章  >  Simple installation steps

Simple installation steps

更新时间:2017-12-25      浏览次数:1041

Simple installation steps

  1. Check all goods against list. Pay attention to the steel-seal letter 1 1223344 on the surface of the scale-bodies,load cells,iron cases(See the following figure).Be ready to install.

1                  2 

3                     4

1                  2

3↑                     4

 

Lift the scale-bodies of corresponding marking with the 28MM shackle and assemble with a crane(usually 15T),overturn and lie them flat(pad wood under the scale bodies to prevent the paint scalling off),the marking of 1↓2↓ with the marking of 1↑2↑ of the scale body,the marking of 3 4with the marking of 3↑4↑of the scale-body,each should be tighten the scale-bodies with 105 sets of M20×60 socket head cap bolts with M30 adjustable spanner.M20 socket head cap spanner andφSimple installation steps

版权所有©2024 上海侦权衡器有限公司 All Rights Reserved   备案号:沪ICP备14040776号-1   sitemap.xml
技术支持:化工仪器网   管理登陆

扫码关注我们

TEL:15216829778

扫码添加微信